Make it snappy; they're back and I'm in a hurry to leave!
Monday, sub-floor and wallboard.
Monday evening, my friends, the nightlight and the toilet.
It's there.
Tuesday morning.
Sailor take warning.
Snow by Friday.
Meantime, back in our cozy bathroom and little hall,
Mudding and skim coating the walls.
Serious sanding going on here.
And lots of venting.
Tuesday afternoon.
Jim's goal for the day, lay the tile.
This is a little demo to show me I really didn't want my tile long way.
You can't make a 6' x 8' bathroom look like anything except a stubby bowling alley.
Width wise it is.
Beautiful!
"You can't walk on it," Jim and Michael both said, and for fun Michael crossed the duster in front of the door for the night.
This morning I found one of Toby's leaves on the tile.
Don't tell him what to do!
Wednesday (today!)
Priming the walls.
The bead board!
Treatment of the shower riser.
This was the whole Plan A, Plan B shower plumbing issue.
Instead of sitting on the floor with a three inch lip the base is on a three inch platform, so the shower drains properly (for the first time in 26 years).
To sit on the floor the drain needed moved, but where it needed moved to is a heating duct.
Old houses!
No grout in yet; that will happen after the paint.
Michael installed all the bead board today.
There was an emergency run to the lumber store, as you can tell.
My toilet has been reset, again.
Jim's stockpiled wax rings, just for me.
Jim says they will be done Friday,
So Good Night all
Until the reveal.